A6 Londonderry to Dungiven Dualling Scheme: Project Documents
More Information
- About the scheme
- Photogallery
- Community Involvement
- Project Documents
Information available for public viewing may be downloaded from this page by clicking on the item you wish to view or download. To view documents in PDF format, you must have Adobe PDF reader software installed on your computer. Many computers have this software pre-installed. If your computer does not have this software, you can download and install PDF reader by clicking on the 'Get Adobe PDF' icon below the main menu.
Documents
- Dungiven Bypass: Stage 1 Scheme Assessment Report - Final Report October 2004
- Dungiven Bypass: Stage 1 Traffic Surveys Report October 2003
- Dungiven Bypass: Archaeology Survey of Route Options 2 and 3
- Castledawson to Londonderry: Stage 1 Scheme Assessment Report - Final Report February 2007
- Stage 2 Scheme Assessment Report Londonderry to Claudy – Final Report June 2009
- Stage 2 Scheme Assessment Report Claudy to Dungiven – Final Report July 2009
Dungiven Bypass: Stage 1 Scheme Assessment Report - Final Report October 2004
- Cover and Table of Contents (256 kb)


- Chapter 1 Introduction (314 kb)


- Chapter 2 Existing Conditions (141 kb)


- Chapter 3 Description of Alternative Strategies & Options (323 kb)


- Chapter 4 Engineering Assessment (794 kb)


- Chapter 5.1 Environmental Assessment Introduction (137 kb)


- Chapter 5.2 Environmental Assessment Air Quality (886 kb)


- Chapter 5.3 Environmental Assessment Cultural Heritage (307 kb)


- Chapter 5.4 Environmental Assessment Disruption due to construction (128 kb)


- Chapter 5.5 Environmental Assessment Ecology and Nature Conservation (291 kb)


- Chapter 5.6 Environmental Assessment Landscape and Visual (487 kb)


- Chapter 5.7 Environmental Assessment Land use (646 kb)


- Chapter 5.8 Environmental Assessment Traffic Noise and vibration (904 kb)


- Chapter 5.9 Environmental Assessment Pedestrians, Equestrians and Community Effects (302 kb)


- Chapter 5.10 Environmental Assessment Vehicle Travellers (140 kb)


- Chapter 5.11 Environmental Assessment Water Quality and Drainage (878 kb)


- Chapter 5.12 Environmental Assessment Geology and Soils (817 kb)


- Chapter 5.13 Environmental Assessment Policies and Plans (140 kb)


- Chapter 6 Traffic and Economic Assessment (617 kb)


- Chapter 7 Scheme Appraisal (346 kb)


- Chapter 8 Comparative Route Appraisal (203 kb)


- Chapter 9 Conclusion (131 kb)


- Appendix A Route options - Plans & Profiles (834 kb)


- Appendix B Existing Conditions (373 kb)


Dungiven Bypass: Stage 1 Traffic Surveys Report October 2003
- Chapters 1 to 6 Traffic Surveys Report (246 kb)


- Appendix A Manual Classified Counts (4068 kb)


- Appendix B Automatic Traffic counts (2587 kb)


- Appendix C Journey Time Data (837 kb)


- Appendix D Vehicle Registration Number Data (835 kb)


Dungiven Bypass: Archaeology Survey of Route Options 2 and 3
Castledawson to Londonderry: Stage 1 Scheme Assessment Report - Final Report February 2007
- Cover and Table of Contents (384 kb)


- Chapter 1 Introduction (692 kb)


- Chapter 1 Figures 1.2.1 to 1.2.4 (677 kb)


- Chapter 2 Assessment of Existing Conditions within the A6 Corridor (145 kb)


- Chapter 2 Figures 2.1.1 to 2.2.1 (734 kb)


- Chapter 3 Identification of Potential Corridors (296 kb)


- Chapter 4 Preliminary Assessment of Potential Corridors (205 kb)


- Chapter 4 Figures 4.2.1 to 4.3.8 (1497 kb)


- Chapter 4 Figures 4.3.9 to 4.5.6 (1436 kb)


- Chapter 5 Engineering Assessment of Preferred Corridor (161 kb)


- Chapter 5 Figures 5.2.1 to 5.2.8 (1296 kb)


- Chapter 5 Figures 5.2.9 to 5.6.2 (1277 kb)


- Chapter 6 Environmental Assessment of Preferred Corridor (335 kb)


- Chapter 6 Figures 6.2.1 to 6.3.1 (988 kb)


- Chapter 6 Figures 6.5.1 to 6.6.1 (1578 kb)


- Chapter 6 Figures 6.7.1 to 6.8.1 (1026 kb)


- Chapter 6 Figures 6.9.1 to 6.11.4 (1212 kb)


- Chapter 6 Figures 6.11.5 to 6.12.3 (997 kb)


- Chapter 6 Figures 6.12.4 to 6.12.7(1331 kb)


- Chapter 7 Traffic and Economic Assessment of Preferred Corridor (800 kb)


- Chapter 7 Figures 7.2.1 to &.2.7 (1210 kb)


- Chapter 7 Figures 7.2.8 to 7.2.14 (1171 kb)


- Chapter 7 Figures 7.2.15 to &.5.3 (1256 kb)


- Chapter 7 Figures 7.5.4 to &.7.7.4 (1230 kb)


- Chapter 8 Summary and Recommendations (391 kb)


Londonderry to Claudy: Stage 2 Scheme Assessment Report – Final Report June 2009 ![]()
- Cover and Table of contents (131kb)


- Chapter 1: Introduction ((975kb)


- Chapter 2: Summary of Existing Conditions (1601kb)


- Chapter 3: Summary of Planning Factors (72kb)


- Chapter 4: Summary of Alternative Schemes (354kb)


- Chapter 5: Summary of Public Consultation (55kb)


- Chapter 6: Summary of Engineering Assessment (133kb)


- Chapter 7: Summary of Environmental Impact Assessment (150kb)


- Chapter 8: Summary of Cost Estimate (161kb)


- Chapter 9: Summary of Traffic & Economic Assessment (152kb)


- Chapter 10: Assessment Summary Tables (74kb)


- Chapter 11: Conclusions and Recommendations (67kb)


- Appendix A: Plan & Profile Drawings (4,389kb)


- Appendix B: Assessment Summary Tables (863kb)


Claudy to Dungiven: Stage 2 Scheme Assessment Report – Final Report July 2009 ![]()



