
DURING CONSTRUCTION
traffic
signals will be installed at the roundabout to improve the operating capacity;
two
lanes of traffic will be maintained along the M1
ON COMPLETION THE JUNCTION WILL
HAVE
new bridges to provide 3 traffic lanes in both directions on the M1;
on / off slips in both directions (as existing);
an
improved roundabout layout with traffic signals.
STOCKMAN'S LANE TO BROADWAY
dual
3 lane motorway;
Belfast-bound bus lane